|
Qingyuan
stands in the northwest of Guangdong
Province and in the middle and lower
reaches of the Beijiang River. It
is located in a joint belt that links
up the Pearl River Delta Valley and
the mountainous areas of northern
Guang-dong. From Qingyuan, it takes
merely 30 minutes to Guangzhou, 60
minutes to Foshan, 90 minutes to Shenzhen.
It has constructed main traffic backbone
consisting of Beijing-Zhuhai Express-way
and Guangzhou- Qingyuan
Express-way, main traffic trunk lines
consisting of #106 and #107 National
Highway, #323 Highway, major traffic
pulse consisting of Beijing-Guangzhou
rail-way, major water navigation line
consisting of the Beijiang River and
its tributary. Together with Qingyuan
Railway Station, Qingyuan Passenger
& Freight Station, Qingyuan Harbor
as its hub, it has weaved out a crisscross
traffic network that has been fully
integrated with that of the Pearl
River Delta as a single entity to
be part of one-hour-life circle. It
is the forefront part that receives
radiation of Hong Kong, Macao Taiwan
and the Pearl River Delta. After the
New Guangzhou Baiyun International
Airport which is merely 28 kilometres
from Qingyuan was put into oparatim
on Aug.5 this year, Qingyuan has constituted
a crisscross three-dimensional traffic
network by air, water and land.
Qingyuan has long been known as
'thoroughfare of three provinces of
Guangdong, Hunan and Guangxi'. It
links Guangzhou in the south, borders
Hunan Province in the north and neighbors
Guangxi Province in the west. It is
thoroughly linked up with all the
inland provinces either by railway
highway or waterway. It's an important
economic corridor that links up Guangdong
and the inland provinces, an important
door for enterprises in the Pearl
River Delta, Hong Kong and Macao to
vast inland market, and a bridge tower
to the Greater Pearl River Delta and
Pan Pearl River Delta.
In the new situation, Qingyuan con-tinues
its efforts to launch a fresh surge
in traffic communication construction.
By the end of 2004 when the key traffic
projects such as Guangzhou-Qingyuan
Expressway, Yingde-Fogang Grade A
Highway, the upgrading of Yinzhan-Yingde
Highway, Qingyuan Avenue, No. 3 Beijiang
Bridge will have been open to traffic,
Qingyuan will enjoy a more convenient
traffic communication.
Qingyuan is exceptionally endowed
with natural ecological environments.
It boasts of picturesque landscape
and fresh air, and its environment
composite index is listed in the forefront
in Guangdong. The total constructed
area of city proper has amounted to
33 square kilometers and a garden-like
river-banked city with a picturesque
scenery of `one-river-two-banks` is
taking shape. As hardware investment
environment has been improved steadily
in Qingyuan, the infrastructural construction
has been well supplemented with auxiliary
facilities. Post and telecommunication
have developed at an extraordinary
speed, reaching the level of the developed
areas. Water, power is oversupplied
and the price is low. The carrier
and environment for investment attraction
have been improved continuously. With
the approval of Guangdong Provincial
Government in May 2003, Qingyuan High-tech
Industrial Development Zone has been
established in addition to Qingyuan
Economic Development Zone and Qingyuan
Ecologic Industrial Park. Within the
Zone various functional patches are
studded the verdant trees and picturesque
landscape like a cluster of bright
pearls. The integration of ecologic
environment protection and industrial
development has achieved unique harmony
of maintained original ecologic environment
and modern industrial development.
The software investment environment
of Qingyuan has also been upgraded
constantly. The investment policies
have been perfected. Ever since 2002,
the CPC and Municipal Government of
Qingyuan have stipulated a series
of policies incessantly. In the beginning
of 2004, preferential policies for
investment attraction have been adjusted
and amended. As a result, threshold
has been constantly lowered, cost
has been incessantly cut down, space
has been continuously yielded, and
service has been increasingly improved.
Qingyuan has become 'low-lying land'
for low-cost investment and its competence
and attraction for investment has
been steadily reinforced.
In order to further reinforce work
in investment-attraction, Qingyuan
tries its best to render the most
efficient, most considerate and top
quality service by practice of “Affairs
handled within the building, Application
accepted at one single department,
Fee paid at one single window, Service
rendered in one coordinated sequence?
The Admini-stration Service Center
of Qingyuan Municipal Government is
fully respon-sible for investors'
inquiries, investment projects registry
on file, examination and approval,
issuance of certificate. Efficient
and top-quality service rendered is
assured while just, honest, quality,
efficient service is guaranteed.
For investment projects without
tough competitiveness to corresponding
trades and not to be subject to examination
and approval of state or province,
the investors may first submit advance
name registry, project registry to
the Center for exami-nation and approval.
After that, business license certificate
will be issued by the industrial &
commercial administration department.
Departments such as environment protection,
fire-prevention, health, should follow
up with services according to law.
When enterprises involved in special
trades such as inflammables, explosives,
public gathering, entertainment apply
for operative business licenses, certificate
their construction plans should be
subject to examination of fire-prevention
and environment protection departments
according to relating policies stipulated
by the state. The enterprises will
not be put into operation until their
plans pass the examination and verification
of the above departments and reach
standards set by the state.
Increasingly improve service attitude
and enhance work efficiency. For invest-ment
projects within limits of examination
and approval of Qingyuan, They will
be done in the shortest possible time
and in the most simplified manner.
Application of investment projects
or capital construction projects complete
with all the required documents should
receive official reply within five
working days upon receipt. Official
reply will be delivered within seven
days upon receipt of contracts and
clauses. Application complete with
all the required documents should
be accepted and business license certificate
should be issued within five working
days upon receipt. Reasons for denial
should be listed if the application
is denied.
Complaint telephone has been set
up in the Center and the Administration
Committee of Qingyuan High-tech Industrial
Development Zone respectively to punctually
accept complaints of investors so
that things should be done to rid
investors of possible worries.
Items Subject to Examination and Approval
within the Center:
1)Registry on file non-governmental
invested capital construction project;
Issuance of certificate of registry
on file; Registry on file may be done
by official written application or
by means of internet at investors'
disposal.
2)Examination and approval of foreign-funded
enterprises, including contracts and
clauses;Issuance of certificate of
approval;
3)Registry of all enterprises with
inv-estment fund inside and outside
Qingyuan;
4)Issuance of legal entity code
certifi-cate;Registry of tax; Registry
of foreign exchanges;
5)Examination and approval of construction
land, construction projects, civil
engineering facilities, temporary
building etc;
6)Examination and approval of application
for fire-prevention system projects;
Acceptance verification of projects
up on completion;
7)Examination and approval of air-defense
facilities within the building;
8)Application & issuance of
sanitary permit;
9)Examination of report of environmental
affection of the construction projects;
10)Verification & registry of
commercial real estate;
11)Registry of residence etc.
|